Wastewater Treatment Plant Expansion
Location
Fort Madison, IA
Owner
North American Packaged Foods Company
Engineer
Bolton & Menk
Services Provided
General Contractor
Contract Amount
$3.4M
Project Summary
Robinson was awarded a $3.4 million contract for the construction and start-up of a new wastewater aeration basin and final clarifier system for their long time food and beverage client at their facility located in Fort Madison, Iowa. Robinson’s scope for the project included demolition and removal of the existing equipment and materials such as miscellaneous piping and concrete pavement, as well as construction/installation of the pretreatment system including:
- Aeration Basin
- Chemical Feed Manholes
- Scum Sumps
- Clarifier
- RAS/WAS Lift Station
- Clarifier Effluent Manhole
- Metering Manhole
- WAS Valve Manhole
- Lime Sludge Valve Manhole
Additionally, Robinson’s scope included installation of all equipment piping and valves; modifications to the existing clarifier control structure, sand shed, and clarifier effluent manholes; and all appurtenances.