Project Summary
To meet the increased demand for producing aluminum coils, this company needed to expand it’s existing facility. The construction manager enlisted Robinson to assist with the process piping portion of the expansion project. Robinson’s scope of work included fabrication and installation of 25,000 lin ft of ½” to 16” carbon steel and stainless pipe for low pressure hydraulic systems, pneumatics systems, lubrication systems, medium pressure hydraulic systems, chiller system, sump pump system, high pressure hydraulic systems, and interconnecting piping to service various tanks throughout the new facility.
The project required extensive planning and a strict sequence of operation to complete our scope of work in a safe and timely manner. Robinson self-performed 100% of the work on this project.